Another massive warehouse for the Majestic site that required all the tools available to us and some new ones we had not previously used, the Majestic Lot 6 project kept us busy through the second half of 2021.
This particular piece of land was saved for last on the massive site due to the fact that the main material that need to be blasted was slag from the old Bethlehem Steel plant and not rock. Owners were very skeptical on how blasting would go, but a little extra powder and a whole lot of extra drill bits made things go exactly to plan. After blasting over 115,000 cyds of bulk slag and another 25,000 cyds of trench we finally found some rock at an enormous outcropping located on the west side of the site. Here we utilized blasting mats and then our newly acquired massive C20 Rock splitter to break and size the extremely dense granitic material.